Activities falling on the critical path have

This question was previously asked in
BPSC AE Paper 6 (Mechanical) 2012 Official Paper
View all BPSC AE Papers >
  1. zero slack
  2. maximum slack
  3. minimum slack
  4. negative slack

Answer (Detailed Solution Below)

Option 1 : zero slack
Free
BPSC AE General Studies Mock Test
4.3 K Users
20 Questions 40 Marks 25 Mins

Detailed Solution

Download Solution PDF

Explanation:

Critical Path

  • Critical path activities are the project tasks that must start and finish on time according to schedule.
  • A delay in any critical path activity will delay the completion of the scheduled project.

Float or Slack in critical activity

  • Slack or float refers to the amount of time that various related tasks can be delayed without pushing the schedule.
  • Float is a measure of schedule flexibility.
  • The critical path, by definition, has no slack. But other tasks not on the critical path may have a built-in float.
  • If the Start date and Finish date for an activity are the same as the schedule, the activity is said to have zero floats.
  • Activities that have zero floats must start on time to prevent the schedule from slipping.
  • Critical activities can also have a negative float.
  • Negative float occurs when an activity finishes before the scheduled date.

Additional Information

Critical Path Method (CPM):

It is commonly used for those projects which are repetitive in nature and where one has prior experience of handling similar projects. Its is a deterministic model and places emphasis on time and cost for activities of a project.

  • A project can be defined as a set of large numbers of activities or jobs that are performed in a certain sequence determined.
  • A network is a graphical representation of a project, depicting the float as well as the sequence of well-defined activities and events.
  • An activity is any portion of a project which consumes time or resources and has a definable beginning and end.
  • Event is the beginning and ending point of activity or group of activities.

B-D-E-H is the critical path in the diagram below.

F1 Krupalu Madhu 28.10.20 D11

Latest BPSC AE Updates

Last updated on Jun 13, 2025

-> BPSC AE 2025 exam date has been revised. The exam will be conducted on July 17, 18 & 19 now. 

-> Candidates who were facing technical issues while filling form can now fill the BPSC AE application form 2025 without any issue. 

->BPSC AE age limit 2025 has been revised.

->BPSC AE application form 2025  was released on April 30. The last date to fill BPSC AE form 2025 was May 28. 

->BPSC AE interview call letters released for Advt. 32/2024.

->BPSC AE notification 2025 has been released. 

->A total of 1024 vacancies are announced through BPSC AE recruitment 2025

->The BPSC Exam Calendar 2025 has been released for the Assistant Engineer Recruitment.

-> The selection will be based on a written exam and evaluation of work experience.

-> Candidates with a graduation in the concerned engineering stream are eligible for this post.

-> To prepare for the exam solve BPSC AE Previous Year Papers. Also, attempt the BPSC AE Civil  Mock Tests.

More Operations Research Questions

Get Free Access Now
Hot Links: teen patti master list teen patti plus teen patti baaz