The estimator should have knowledge of works, labor, reliability, and possible faults, and his cost statements must be based on _______.

This question was previously asked in
SSC JE Electrical 15 Nov 2022 Shift 2 Official Paper
View all SSC JE EE Papers >
  1. accepted tenders
  2. special supervision
  3. previous tenders
  4. reliable evidence

Answer (Detailed Solution Below)

Option 4 : reliable evidence
Free
RRB JE CBT I Full Test - 23
14.3 K Users
100 Questions 100 Marks 90 Mins

Detailed Solution

Download Solution PDF

Purpose of the Estimate

  • Construction estimating is the process of forecasting a project’s costs. However, true project costs are only known once the project is completed.
  • Accurate estimating is the foundation of profitable contracting. Accuracy must be based on several factors.
  • A good estimate prevents the contractor from losing money and helps the customer avoid overpaying.
  • A good estimator should have knowledge of works, labor, reliability, and possible faults, and his cost statements must be based on reliable evidence.

​The key factors that make up a successful estimate are:

1.) Selection of materials

 Residential, commercial, and industrial projects require uniquely different materials. A receptacle designed for a residential home cannot be installed in an industrial hazardous location, and the cost difference between these two types of receptacles can reach several thousand dollars.

2.) Required quantity of material

Accuracy is key to the estimating process. Quality detailed installation drawings should provide the estimator with the ability to determine accurate quantities of materials required for the project.

3.) Material pricing at the market level

The contract technical specifications provide the product manufacturers and model numbers for materials to be installed. It is paramount that the specified materials are installed as outlined in the documents. Substituting specified materials with non-specified products can be costly to the contractor. 

4.) Labor requirement

The estimator must have a full understanding of labor units. Each item required to build a project has an associated labor unit. Labor units require adjustment due to the conditions of installation.

5.) Equipment, tools, and consumables

Equipment such as lifts, generators and trenching machines must be included in rental costs if you do not own the equipment. Consumables are materials and tools that the estimator doesn’t include in his take-off. These items are difficult to quantify. Consumables are real project costs and should be included in the estimate.

Latest SSC JE EE Updates

Last updated on Jun 16, 2025

-> SSC JE Electrical 2025 Notification will be released on June 30 for the post of Junior Engineer Electrical/ Electrical & Mechanical.

-> Applicants can fill out the SSC JE application form 2025 for Electrical Engineering from June 30 to July 21.

-> SSC JE EE 2025 paper 1 exam will be conducted from October 27 to 31. 

-> Candidates with a degree/diploma in engineering are eligible for this post.

-> The selection process includes Paper I and Paper II online exams, followed by document verification.

-> Prepare for the exam using SSC JE EE Previous Year Papers.

Get Free Access Now
Hot Links: teen patti real cash withdrawal teen patti lucky teen patti club apk all teen patti teen patti casino download