Question
Download Solution PDFA generating station has 500 MW maximum demand and annual load factor of 50%, capacity factor of 40%. The reserve capacity of the plant is
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFPlant capacity factor: It is the ratio of actual energy produced to the maximum possible energy that could have been produced during a given period.
\(Plant\;capacity\;factor = \frac{{{\rm{Actual\;energy\;produced}}}}{{Maximum\;energy\;that\;could\;have\;been\;produced}}\)
Plant capacity factor \( = \frac{{Average\;demand × T}}{{Plant\;capacity × 100}}\)
Plant capacity factor \(= \frac{{Average\;demand}}{{Plant\;capacity}}\)
\(Annual\;plant\;capacity\;factor = \frac{{{\rm{Annual\;kWh\;output}}}}{{Plant\;capacity × 8760}}\)
The plant capacity factor is an indication of the reverse capacity of the plant. A power station is so designed that it has some reserve capacity for meeting the increased load demand in the future. Therefore, the installed capacity of the plant is always somewhat greater than the maximum demand on the plant.
Reserve capacity = Plant capacity – Maximum demand
If the maximum demand on the plant is equal to plant capacity, then load factor and plant capacity factor will have the same value. In such a case, the plant will have no reserve capacity.
Load factor: The ratio of average load to the maximum demand during a given period is known as the load factor.
Load factor = average load/maximum demand
Energy generated = Average load x Time (T)
Calculation:
Energy generated/annum = Maximum demand × load factor × hours in a year
= 500 × 0.5 × 8760 = 2.19 × 106 MWh
Plant capacity factor = (units generated/annum)/(Plant capacity × hours in a year)
Plant capacity \(= \frac{{2.19\; × \;{{10}^6}}}{{0.4\; × \;8760}} = 625\;MW\)
Reserve capacity = plant capacity – maximum demand
= 625 – 500 = 125 MW
Another Method:
Given that,
Load factor = 50% = 0.5
Plant capacity factor = 40% = 0.4
Maximum demand = 500 MW
Average demand = Load factor × Maximum demand
Average demand = 0.5 × 500 = 250 MW
Plant capacity = Average demand / Plant capacity factor
Plant Capacity = 250 / 0.4 = 625
Reserve capacity = 625 - 500
Reserve capacity = 125 MW
Last updated on Jul 2, 2025
-> ESE Mains 2025 exam date has been released. As per the schedule, UPSC IES Mains exam 2025 will be conducted on August 10.
-> UPSC ESE result 2025 has been released. Candidates can download the ESE prelims result PDF from here.
-> UPSC ESE admit card 2025 for the prelims exam has been released.
-> The UPSC IES Prelims 2025 will be held on 8th June 2025.
-> The selection process includes a Prelims and a Mains Examination, followed by a Personality Test/Interview.
-> Candidates should attempt the UPSC IES mock tests to increase their efficiency. The UPSC IES previous year papers can be downloaded here.