A dumpy level is a fundamental surveying instrument designed for measuring horizontal and vertical angles to establish points at the same horizontal level. Comprising a telescope mounted on a tripod, a Dumpy level incorporates a spirit level to ensure accuracy. The instrument is widely used in construction, topographic surveys, and geodetic work, providing precise measurements for leveling in surveying and height determination.
This blog shall discuss all about Dumpy level, including its definition, applications, components, advantages and disadvantages. This topic is important for all the upcoming Civil Engineering Examinations, including SSC JE CE and RRB JE Civil.
Fig 1: dumpy level
Dumpy level is an instrument used for establishing points within the same horizontal plane. It facilitates the determination of elevations for various points and the measurement of distances between points at the same elevation. Invented by William Gravatt in 1832, the dumpy level features a fixed telescope on its supports, preventing rotation in the vertical axis.
Choose the correct answer and click 'Submit' button. At the end of the quiz, you can review your score and view explanations.
Axis of vertical aerial photograph coincides with the _______
The characteristics of contours are given in statements S1, S2 and S3.
S1: Two contour lines of different elevations can cross each other in the case of an overhanging cliff.
S2: Generally the contour lines do not cross a valley or a ridge line at the right angle.
S3: A contour line passing through a point is at the right angle to the line of maximum slope at that point.
Identify the wrong statement(s).
View your detailed analysis and question-wise summary
The dumpy level is a commonly used instrument in surveying for establishing horizontal lines and transferring levels across sites. It is precise, easy to handle, and made of several mechanical and optical components that together ensure accurate leveling. Below is a detailed explanation of each part as shown in the diagram:
Fig 2:
Civil Engineering Topics | Free PDF Link |
---|---|
Download Free Building Construction, Maintenance Notes PDF Created by Experts | Download Link |
Grab the Free Concrete Technology PDF used by AE/JE Rankers | Download Link |
Get your hands on the most trusted Free Engineering Mechanics PDF | Download Link |
Exclusive Free Surveying PDF crafted by top mentors | Download Link |
The various applications of Dumpy level subsume the following:
The procedure involved in Dumpy level surveying initiates with three adjustment of dumpy level. These are:
Setting Up the Dumpy Level: The instrument is affixed to the tripod stand using clamp screws. Spread the tripod legs, position the instrument at a convenient height, and initiate the leveling process. Begin by fixing two legs in the ground at a point, and center the bubble in the bubble tubes by adjusting the third leg.
Leveling Process: Leveling up the instrument involves using foot screws or leveling screws. Align the telescope parallel to any two leveling screws, centering the bubble in the tube by adjusting both screws inward or outward. Rotate the telescope 90 degrees and adjust the third screw until the bubble centers. Repeat this process until the bubble consistently stays at the middle, regardless of the telescope's position.
Focusing the Telescope: Achieve focus by adjusting the eyepiece and focusing screw. Align the eyepiece until the crosshairs of the diaphragm are clearly visible. To eliminate parallax error, use a white paper for a sharp vision of crosshairs. Adjust the focusing screw to obtain a clear image of the objective or staff. Focusing is complete when the crosshairs bisect the objective or staff with a clear vision.
After these adjustments, rotate the telescope toward the line of the objective or staff, bisect it, and take level measurements at different points. The values are determined from a known benchmark point in the area. The measurements taken are tabulated as under:
Position Observed |
Level Reading (m) |
HCR (m) |
LCR (m) |
(HCR - LCR) × 100 |
Distance from Instrument (m) |
Remarks / Error |
1 |
1.245 |
1.270 |
1.220 |
5.0 |
15 |
Benchmark (BM) |
2 |
1.550 |
1.580 |
1.520 |
6.0 |
30 |
Fore sight (FS) |
3 |
1.300 |
1.330 |
1.270 |
6.0 |
45 |
Intermediate sight (IS) |
The advantages of Dumpy level are:
Some of the major limitations of Dumpy level are:
This blog uncovered all the important information related to Dumpy level, encompassing its parts, procedure, applications and the various advantages and disadvantages. If you are preparing for State and Central level Civil examinations and other diploma-level exams, get enrolled in AE/JE Civil Coaching on the Testbook App.
Also, attempt a wide range of SSC JE Civil Mock Tests and SSC JE Civil Previous Year Papers available on the Testbook App itself.
Download the Testbook APP & Get Pass Pro Max FREE for 7 Days
Download the testbook app and unlock advanced analytics.