Construction Materials and Management Question 1:

Which technology in construction is closely linked to design coordination, clash detection, and scheduling?

  1. Monolithic RCC
  2. Building Information Modelling (BIM)
  3. Speed floor system
  4. Gypsum panel building

Answer (Detailed Solution Below)

Option 2 : Building Information Modelling (BIM)

Construction Materials and Management Question 1 Detailed Solution

Explanation:

  • Building Information Modelling (BIM) is a digital 3D modeling process used in construction to:

    • Integrate architectural, structural, and MEP (Mechanical, Electrical, Plumbing) systems

    • Detect clashes between different design elements (e.g., beam and duct intersections)

    • Enable 4D (time) scheduling and 5D (cost) estimation

  • BIM enhances collaboration among stakeholders (architects, engineers, contractors) by using a central coordinated model.

  • Widely used in:

    • Metro rail projects

    • Smart cities

    • Hospitals

    • Airports

  • Incorrect options:

    • Monolithic RCC is a construction method, not a digital tool.

    • Speed floor system and gypsum panels are physical construction technologies, unrelated to digital coordination.

BIM is mandated or encouraged by agencies like CPWD, NBCC, and is referenced in the National Building Code of India 2016 for efficient project delivery.

Construction Materials and Management Question 2:

In the 3-S system of industrialized construction, 3-S stands for:

  1. Speed, Steel, Safety
  2. Shear, Strength, Stiffness
  3. Strength, Stability, Sustainability
  4. System, Speed, Safety

Answer (Detailed Solution Below)

Option 4 : System, Speed, Safety

Construction Materials and Management Question 2 Detailed Solution

Explanation:

  • The 3-S system is an industrialized construction approach that emphasizes:

    • System: Use of standardized, modular, precast components (e.g., wall panels, beams, staircases)

    • Speed: Quick assembly of components on-site due to factory-made parts

    • Safety: Reduced on-site labor and formwork leading to fewer accidents and better quality control

  • Widely used in:

    • Mass housing schemes

    • Government infrastructure projects

    • Urban residential complexes

  • Incorrect options:

    • "Speed, Steel, Safety" is misleading — steel is a material, not a concept of the system.

    • "Shear, Strength, Stiffness" and "Strength, Stability, Sustainability" are mechanical or structural properties, not part of the 3-S construction terminology.

The 3-S system is designed to modernize construction, reduce delays, and improve safety using precast RCC technologies.

Construction Materials and Management Question 3:

Which innovative system is specifically designed for rapid construction with core insulation?

  1. Speed floor system
  2. Expendable polystyrene panel system
  3. Modular steel frame
  4. Glass-reinforced gypsum

Answer (Detailed Solution Below)

Option 2 : Expendable polystyrene panel system

Construction Materials and Management Question 3 Detailed Solution

Explanation:

  • The Expanded Polystyrene (EPS) Panel System is a lightweight sandwich panel system made of:

    • Polystyrene core (insulation)

    • Cement-based outer boards (strength and durability)

  • Key Features:

    • Rapid installation due to modular design

    • Excellent thermal insulation from the EPS core

    • Reduces structural dead load and speeds up construction

    • Common in mass housing, shelters, prefab cabins, and energy-efficient buildings

  • Incorrect options:

    • Speed floor system is for flooring speed, not insulation.

    • Modular steel frame offers structural speed but lacks integrated insulation.

    • Glass-reinforced gypsum is a durable panel but not designed specifically for insulation.

The EPS core panel system excels in energy efficiency, making it ideal for fast, sustainable construction in both rural and urban projects.

Construction Materials and Management Question 4:

Prefabricated civil structures are advantageous mainly because:

  1. They use only steel as material
  2. They eliminate need for foundations
  3. They are constructed entirely on-site
  4. They reduce construction time and allow repetitive use of elements

Answer (Detailed Solution Below)

Option 4 : They reduce construction time and allow repetitive use of elements

Construction Materials and Management Question 4 Detailed Solution

Explanation:

  • Prefabricated structures are built by assembling components manufactured in a factory, which are then transported to the site.

  • Key advantages:

    • Faster construction timelines

    • Reduced labor costs

    • Higher quality due to factory-controlled environment

    • Repetitive elements allow for standardization and modular designs

  • Incorrect statements:

    • Prefabrication can use various materials, including concrete, wood, steel, etc., not just steel.

    • Foundations are still required to support prefabricated units.

    • Prefab structures are not constructed entirely on-site — the opposite is true; most of the work is off-site.

Prefabrication is ideal for mass housing, schools, compound walls, and disaster relief shelters where speed and uniformity are crucial.

Construction Materials and Management Question 5:

Which method is commonly used for terrace waterproofing in modern buildings?

  1. Use of false flooring
  2. Bituminous membrane application
  3. Thermal insulation using gypsum
  4. Pest control treatment

Answer (Detailed Solution Below)

Option 2 : Bituminous membrane application

Construction Materials and Management Question 5 Detailed Solution

Explanation:

  • Bituminous membranes are one of the most widely used materials for waterproofing flat terraces and roofs.

  • They are applied as sheets or liquid coatings that form a seamless, water-resistant layer.

  • Advantages:

    • Excellent adhesion to concrete

    • Durable and elastic, adapting to thermal movement

    • Common in both residential and industrial buildings

  • False flooring is related to aesthetics and service routing, not waterproofing.

  • Gypsum insulation addresses thermal performance, not moisture prevention.

  • Pest control targets biological threats like termites, not water ingress.

Bituminous membranes are mentioned in IS 3067 as a standard method for roof and terrace waterproofing.

Top Construction Materials and Management MCQ Objective Questions

As per IS 383 (1970), the passing percentage of fine aggregates under Zone IV from an IS 600 microns sieve is ________.

  1. 15-34%
  2. 8-30%
  3. 80-100%
  4. 60-79%

Answer (Detailed Solution Below)

Option 3 : 80-100%

Construction Materials and Management Question 6 Detailed Solution

Download Solution PDF

Concept:

Fine aggregate:

The grading of fine aggregates, when determined as described in IS: 2386 (Part I)-1963 shall be within the limits given in Table 4 and shall be described as fine aggregates, Grading Zones I, II, III and IV: Where the grading falls outside the limits of any particular grading zone of sieves other than 600-micron IS Sieve by a total amount not exceeding 5 percent, it shall be regarded as falling within that grading zone. This tolerance shall not be applied to the percentage passing the 600-micron IS Sieve or to the percentage passing any other sieve size on the coarse limit ef Grading Zone I or the finer limit of Grading Zone IV.  

As per IS:383-1970:(Table 4)

IS sieve Designation Percentage Passing For
 

Grading

Zone I

Grading

Zone II

Grading

Zone III

Grading Zone IV
10 mm 100 100 100 100
4.75 mm 90-100 90-100 90-100 95-100
2.36 mm 60-95 75-100 85-100 95-100
1.18 mm 30-70 55-90 75-100 90-100
600 micron 15-34 35-59 60-79 80-100
300 micron 5-20 8-30 12-40 15-50
150 micron 0-10 0-10 0-10 0-15

Fill in the blank with the most appropriate option.

Quicklime reacts with water to form ______.

  1. limestone
  2. slaked lime
  3. chloride of lime
  4. chalk powder

Answer (Detailed Solution Below)

Option 2 : slaked lime

Construction Materials and Management Question 7 Detailed Solution

Download Solution PDF

The correct answer is slaked lime.

  • Quicklime (CaO) reacts with water to form slaked lime {Ca(OH)2}.
  • The addition of a limited amount of water to quick lime is called slacking of lime.
  • When Calcium oxide is mixed with water it forms Calcium Hydroxide.
  • The above reaction can be written as
    • ⇒ CaO + H2O → Ca(OH)2
  • Calcium Hydroxide is used in the preparation of Mortar.

Additional Information

Common Name

Chemical formula/Compound name

Lime Stone

CaCO3/Calcium Carbonate

Chloride of Lime

Ca(OCl)2/Calcium Hypochlorite

Chalk Powder

CaCO3/Calcium Carbonate

The process of taking out stones from natural rock is known as:

  1. Weathering
  2. Quarrying
  3. Dressing
  4. Cladding

Answer (Detailed Solution Below)

Option 2 : Quarrying

Construction Materials and Management Question 8 Detailed Solution

Download Solution PDF

1) Weathering is the process of breaking down and loosening the surface minerals of rock so that they can be transported away by agents of erosion such as water, wind and ice.

2) Quarrying is the multistage process by which rock is extracted from the ground and crushed to produce aggregate, which is then screened into the sizes required for immediate use, or for further processing, such as coating with bitumen to make bituminous macadam or asphalt.

3) Dressing of Stone is the working of quarried stone into the shape and size required for use. This can be necessary as stones obtained from quarrying generally do not have the exact required dimensions or finish.

4) Cladding is a layer of natural stone applied to the walls. When applied it gives an effect such that the wall is made of the natural stone itself.

The stone is said to be high if the toughness index of the stone in the impact test is:

  1. Less than 9
  2. More than 9
  3. Less than 19
  4. More than 19

Answer (Detailed Solution Below)

Option 4 : More than 19

Construction Materials and Management Question 9 Detailed Solution

Download Solution PDF

Concept:

Impact test:

Impact test is used to determining the toughness of stone, it is performed in an Impact Test Machine as followed:

  1. A cylinder of diameter 25mm and height 25mm is taken out from the sample of stones.
  2. It is then placed on the cast iron anvil of the machine.
  3. A steel hammer of weight 20N is allowed to fall axially in a vertical direction over the specimen.
  4. The height of the first blow is 1 cm, that of the second blow is 2 cm, that of the third blow is 3 cm, and so on.
  5. Blow at which specimen breaks is noted. If it is an nth blow, ‘n’ represents the toughness index of stone.

Toughness index

Toughness

Not tough

13-19

Moderately tough

> 19

High tough

The process of adding water to lime to convert it into a hydrated lime is termed as:

  1. watering
  2. baking
  3. hydration
  4. slaking 

Answer (Detailed Solution Below)

Option 4 : slaking 

Construction Materials and Management Question 10 Detailed Solution

Download Solution PDF

Explanation:

Slaking is the process in which quick lime reacts with water, during this reaction, it swells, cracks, and falls out as calcium hydroxide.

Match the name of the stone in List 1 with the use of that stone in List 2.

List 1

List 2

A. Granite

1. Ornamental Work

B. Marble

2. Sea Walls

C. Lime stone

3. Flooring

D. Slate

4. Manufacture of Cement

  1. A – 2, B – 1, C – 4, D - 3
  2. A – 3, B – 1, C – 2, D - 4
  3. A – 2, B – 3, C – 1, D - 4
  4. A – 1, B – 4, C – 2, D - 3

Answer (Detailed Solution Below)

Option 1 : A – 2, B – 1, C – 4, D - 3

Construction Materials and Management Question 11 Detailed Solution

Download Solution PDF

Concept:

Classification and uses of building stones-

Type

Classification

Uses

Granite

Igneous rock

Most suitable for important engineering works such as bridge abutments, piers, dams, Sea Walls, light houses, etc

Marble

Metamorphic rock

Most suitable for monuments, statutes flooring, decorative and ornamental works

Lime stone

Sedimentary rock

Suitable for flooring, paving, roofing and in the manufacturing of cement.

Slate

Metamorphic rock

Most suitable for roof covering, flooring, damp proofing and partitions.

Sandstone

Sedimentary rock

In the form of flag stone for paving, tile stone for roofing, natural stone for ornamental works and grit for heavy engineering works

Laterite (Sandy clay stone)

Sedimentary rock

Suitable for rough stone masonry work, The nodular variety yields road metal

Trap and basalt

Igneous rock

Suitable for road metal and concrete aggregates, used for decorative features.

The crushing strength (MPa) of good stone used for construction of a building must not be less than ____.

  1. 10
  2. 50
  3. 100
  4. 120

Answer (Detailed Solution Below)

Option 3 : 100

Construction Materials and Management Question 12 Detailed Solution

Download Solution PDF

A good building stone has the following properties:

  • Percentage of wear in the attrition test should not be more than 3
  • Specific gravity should be at least 2.7
  • Coefficient of hardness should be greater than 17
  • Percentage of water absorption by weight of stone should be less than 5
  • Toughness index should not be less than 13
  • Crushing strength should be greater than 100 N/mm2 or MPa.

If fineness modulus of sand is 2.5, it is graded as:

  1. Very fine sand
  2. Fine sand
  3. Medium sand
  4. Coarse sand

Answer (Detailed Solution Below)

Option 2 : Fine sand

Construction Materials and Management Question 13 Detailed Solution

Download Solution PDF

Explanation:

Fineness modulus of sand (fine aggregate) is an index number that represents the mean size of the particles in sand.

FM is the sum of the total percentages retained on each specified sieve divided by 100.

Type of Sand

Fineness Modulus Range

Fine Sand

2.2 – 2.6

Medium Sand

2.6 – 2.9

Coarse Sand

2.9 – 3.2

Vicat apparatus is used for-

  1. Fineness test
  2. Consistency test
  3. Soundness test
  4. None of the above

Answer (Detailed Solution Below)

Option 2 : Consistency test

Construction Materials and Management Question 14 Detailed Solution

Download Solution PDF

Explanation:

Standard consistency test:

  • This test determines the percentage of water required to make workable cement paste.
  • Vicat’s apparatus is used to perform this test.
  • Temperature during test = 27 ± 2°C
  • Relative humidity = 90%
  • As per Vicat’s test ‘the percentage of water added to the cement at which the needle can not penetrate 5-7 mm from bottom of the mould is called consistency.
  • For OPC consistency is around 30%
  • In order to make a cement paste of normal consistency, the percentage of water varies from 25 to 35%.

Important Points

Sr no

Tests on cement

Apparatus or method

1

Fineness test

Sieve method or Air permeability test

2

Standard consistency test

Vicat’s apparatus

3

Initial setting time test

Vicat’s apparatus (Vicat’s needle)

4

Final setting time test

Vicat’s apparatus (Vicat’s needle)

5

Compressive strength test

Universal Testing Machine (UTM)

6

Tensile strength test

Standard briquettes test
Michaeli’s compound lever apparatus

7

Soundness test

Le-chatelier’s apparatus

Maximum permissible wear in stones for road work is

  1. 1%
  2. 2%
  3. 3%
  4. 4%

Answer (Detailed Solution Below)

Option 2 : 2%

Construction Materials and Management Question 15 Detailed Solution

Download Solution PDF

A good building stone has the following properties:

  • The percentage of wear in the attrition test should not be more than 2 for road work.
  • Specific gravity should be at least 2.7
  • The coefficient of hardness should be greater than 17
  • Percentage of water absorption by weight of stone should be less than 5
  • The toughness index should not be less than 13
  • Crushing strength should be greater than 100 N/mm2

For road works, Wear not more than 2% and for building stone, It should not more than 3%.

Hot Links: teen patti party teen patti master apk teen patti joy 51 bonus teen patti real